Greater Cairo Metro Line 3

Click To Enlarge

 

Line 3 will extend from the north west of Greater Cairo at Imbaba to the north east at Heliopolis serving also the Cairo International Airport. The Line shall cross under the two branches of the River Nile. The total length of the Line is approximately 30 km most of which is bored tunnel. The stations will be constructed by the cut and cover method. The basic design is currently in progress.

tunnelling_f_line3-1.jpg (169300 bytes)

Click To Enlarge