El-Azhar Two Road Tunnels

Click To Enlarge

 

It was decided to construct two road tunnels as part of the general plan for the preservation and development of the historical Islamic area in Cairo. The tunnels aim at creating a vehicular free surface region for tourism and pedestrians as well as improving the environmental conditions.

Each tunnel is 2.7 Km long extending between Salah Salem Street and Opera Square in the city centre. Each tunnel has an internal diameter of 8.35 m, thus one of the TBMs used in Metro Line 2 was utilized for the construction of the tunnels. 

The cut and cover construction method was used in the execution of the entrance and exit sections of each tunnel as well as the four ventilation stations. Between the the cut and cover sections, the twin tunnels were bored in generally sandy layer.

Emergency exits were used every 100 m along the sidewalks. These exits are provided with slide escapes to a gallery under the roadway. In case of fire, these escapes will assist in the evacuation op people to safely reach the ventilation stations which contain lifts and stairs leading to the surface. A sprayed fireproof lining to the tunnels was also incorporated to resist a 100 MW fire. The operation of the tunnels is completely monitored by a  totally centralized Control Centre located inside the tunnels. 

The project was inaugurated in 2001.